Industrial

Washington Industrial Properties for Sale

/ Page 8
Notify Me
List
Map
Seattle, WA Spokane, WA Kennewick, WA Tacoma, WA Pasco, WA Richland, WA Vancouver, WA Yakima, WA
Found 619 industrial property listings for sale in Washington, averaging $194/sq ft. Use valuation data to compare deals faster.
Sort:
Industrial Manufacturing Campus
Industrial Manufacturing Campus

6955 Salashan Pkwy, Ferndale, WA 98248

Contact for pricing
104,000 sqft 7.00 AC lot

Two sprinklered buildings provide substantial power, loading capacity, and space for industrial operations.

View details
Flex Space with Garage
Flex Space with Garage

6802-6804 112th Ave E, Puyallup, WA 98372

Contact for pricing
6,208 sqft

Remodeled office space with a secured, paved yard and multi-door garage for contractor operations.

View details
Fenced-Yard Flex Space
Fenced-Yard Flex Space

2546 State Route 101, Ilwaco, WA 98624

Contact for pricing
4,660 sqft 1.54 AC lot

Flexible Industrial zoning combines warehouse, retail, office, RV accommodations, and a secured outdoor yard.

View details
Laboratory-Built Flex Space
Laboratory-Built Flex Space

14401 SE 1st St, Vancouver, WA 98684

Contact for pricing
35,175 sqft

Fully occupied by a medical testing operator, with laboratory, office, and storage areas.

View details
Industrial Building with Retail Showroom
Industrial Building with Retail Showroom

2121 Commerce Street, Aberdeen, WA 98520

Contact for pricing
5,000 sqft 0.51 AC lot

Metal-frame warehouse-shop with a street-facing showroom, office, built-in apartment, and fenced yard within an industrial park.

View details
Industrial Flex Facility with Secure Yard
Industrial Flex Facility with Secure Yard

2301 131st Ave NE, Lake Stevens, WA 98258

Contact for pricing
9,900 sqft 2.52 AC lot

Flexible industrial property combining warehouse, office, heavy power, and substantial fenced outdoor storage capacity.

View details
Realmo Analytics Monitor Off-market properties and contact owners who are ready to sell. Many signals applied to make quality leads for you. Get Leads
Updated Mixed-Use Warehouse in Kelso
Updated Mixed-Use Warehouse in Kelso

103 Allen St, Kelso, WA 98626

$369,000
4,283 sqft 0.23 AC lot

Mixed-used warehouse

View details
Flex Space with Office Buildout
Flex Space with Office Buildout

1505 E Spokane, Pasco, WA 99301

$825,000
0.44 AC lot

Flex property includes large shop doors, office areas, and on-site parking.

View details
Flex Warehouse with Yard Parking
Flex Warehouse with Yard Parking

27802 Pacific Hwy S, Federal Way, WA 98003

Contact for pricing
8,000 sqft 2.04 AC lot

Unit A offers office space plus paved, fenced yard and parking for up to 70 vehicles or outdoor storage.

View details
Flex Space Building
Flex Space Building

2204 North Madson Street, Liberty Lake, WA 99019

Contact for pricing
8,000 sqft 1.55 AC lot

General Commercial zoning and a 2018 construction date support a modern commercial configuration.

View details
Flex Space with 22-Foot Eaves
Flex Space with 22-Foot Eaves

205-5820 Road 92, Pasco, WA 99301

Contact for pricing
4,140 sqft

Flexible commercial space includes separate utility metering and high-speed fiber connectivity.

View details
Flex Space Building
Flex Space Building

8517 35th Avenue Northeast, Seattle, WA 98115

Contact for pricing
4,600 sqft 0.52 AC lot

A 4,600-square-foot building occupies a 0.52-acre parcel zoned NC2P-55(M).

View details
Flex Space Office and Warehouse Corner
Flex Space Office and Warehouse Corner

507-8-6159 W Deschutes Ave, Kennewick, WA 99336

Contact for pricing
1,560 sqft

Flex unit combines office buildout with restroom and warehouse with direct office access on a high-visibility corner.

View details
Flex Space with Office Component
Flex Space with Office Component

26291 Pioneer Way, Poulsbo, WA 98370

$1,370,000
4,000 sqft 1.20 AC lot

Under-construction flex space offers adaptable design and available three-phase power.

View details
Remodeled Flex Space with Loading Dock
Remodeled Flex Space with Loading Dock

3001 Main St, Union Gap, WA 98903

Contact for pricing
5,551 sqft

Modern commercial layout combines showroom, storage, office, and shipping functionality.

View details
Flex Property with Secured Yard
Flex Property with Secured Yard

2000 116TH, Seattle, WA 98168

$4,395,000
1.19 AC lot

Office and warehouse space connect to a fenced outdoor area for vehicles and equipment.

View details
Industrial Flex Condominium
Industrial Flex Condominium

340-360 Upland Dr, Tukwila, WA 98188

Contact for pricing
4,791 sqft

Vacant small-bay commercial unit with office, warehouse, new roll-up access, and immediate occupancy availability.

View details
Industrial Outdoor Storage
Industrial Outdoor Storage

2218 112th Street East, Tacoma, WA 98445

Contact for pricing
3,000 sqft 0.87 AC lot

A secured site combines three buildings with grade-level loading for vehicle and equipment access.

View details
Secured Flex Space
Secured Flex Space

5909 12th St E, Fife, WA 98424

Contact for pricing
8,000 sqft

Configured with finished offices, reception, conference, lunch, and storage areas for a range of commercial operations.

View details
Two-Suite Industrial Building
Two-Suite Industrial Building

206 N Benton St, Kennewick, WA 99336

Contact for pricing
21,404 sqft 0.80 AC lot

The two-suite configuration allows an owner to use one space while leasing the other.

View details
Mixed-Use Suite With Loading Access
Mixed-Use Suite With Loading Access

5804 Road 90, Pasco, WA 99301

Contact for pricing
6,400 sqft 3.00 AC lot

Flexible commercial space combines retail, office, and warehouse functions with highway access and on-site parking.

View details
Heavy Industrial Distribution Facility
Heavy Industrial Distribution Facility

707 N Freya St, Spokane, WA 99202

Contact for pricing
6,416 sqft 1.36 AC lot

Fenced heavy industrial site with three bays, multiple grade-level doors, and 3-phase power across three buildings.

View details
Industrial Flex Space with Loading Docks
Industrial Flex Space with Loading Docks

1661 Fowler St, Richland, WA 99352

Contact for pricing
11,500 sqft 4.08 AC lot

Heated warehouse space includes office support, fire suppression, and dock-high loading access.

View details
Multi-Tenant Flex Building with Bay Doors
Multi-Tenant Flex Building with Bay Doors

2402 Henderson Loop, Richland, WA 99352

Contact for pricing
0.61 AC lot

Under-construction commercial space offers office, retail, and warehouse functionality within a multi-tenant building.

View details
Not finding what you need? Try buying leads tailored to your intent and find the right opportunities before everyone else. Get Leads
List
Map
Why this one?