Day Care

Dayton, OH Day Care Centers for Lease

Notify Me
List
Map
Vandalia, OH Englewood, OH Trotwood, OH Clayton, OH Huber Heights, OH Union, OH Tipp City, OH Moraine, OH
Office Building with Flexible Suites
Updated: Jul 28
Office Building with Flexible Suites

7271 N Main St, Dayton, OH 45415

Contact for pricing
12,329 sqft
Flexible office suites from 593 SF+/- to 9,556 SF+/-
12,329 SF office building built in 1985
Abundant natural light with a contemporary design
Approximately 20,000 cars per day on the highly visible corridor
Easy access to Englewood and I‑70
View details
Retail Strip Mall and Daycare
Updated: Jun 19, 2024
Retail Strip Mall and Daycare

4228 N Main St, Dayton, OH 45405

Contact for pricing
3,643 sqft 0.08 AC lot
Includes two properties: a retail strip mall (3643 sq ft) and a commercial building (1980 sq ft).
High‑traffic location on a bus line with national retailers across the street.
Ample parking available, with an additional parking lot created by the seller.
Commercial building previously used as a daycare center, featuring updates and fenced playground areas.
Easy access to the property due to a traffic light.
View details
2 active listings match your search: Day Care for lease in Dayton, OH. Based on your search, we've also compiled 4 Potential Opportunities for your consideration: 4 spaces in nearby cities.

Day care centers for Lease in Nearby Cities

Here are 4 Similar Spaces we found in Nearby Locations for your consideration.

Day Care Center with Classrooms
Day Care Center with Classrooms

5675 Avery Rd, Dublin, OH 43016

$39.95 SF/Yr
11,450 sqft  Built 2024  2.98 acres
Highway access  Road access

A 2024-built facility offers administrative offices, shared areas and parking along Avery Road.

Building signage  Outdoor space
View details
Day Care Center with FF&E
Day Care Center with FF&E

6158 Corporate Center Dr, Dublin, OH 43016

Contact for pricing
11,450 sqft  Built 2024  2.9 acres

Built in 2024, the facility has furniture, fixtures, and equipment available.

Furnished  Ample parking  Building signage
View details
Office/Medical Buildings with Playground
Office/Medical Buildings with Playground

3386 -3400 Snouffer Rd, Columbus, OH 43235

Far Northwest
$11.95 SF/Yr
Built 2004

Two freestanding office/medical buildings with an autism treatment center buildout and a fenced outdoor playground area.

View details
Ground Floor Daycare Facility
Ground Floor Daycare Facility

2300 S High St, Columbus, OH 43207

Triple net (NNN) Far South
Contact for pricing
6,353 sqft

Purpose-built ground floor retail space configured for early childhood education with restrooms, reception, and a dedicated breakroom.

View details

Dayton, OH Day care centers Lease Rates & Market Statistics

Explore 2 Day care centers for lease in Dayton, OH on Realmo, a commercial real estate exchange covering the Dayton area. The current inventory totals 15,972 square feet of properties.

Day care centers are one of the more limited space types in Dayton, with just 2 listings currently available — a scarcity worth factoring into lease negotiations. Also worth a look for tenants weighing alternatives: Other specialty properties (5 listings) elsewhere in the Dayton market.

How to lease a daycare center in Dayton, OH

  1. Get licensing pre-approval before signing. Childcare centers, preschools, nurseries, and early learning programs must have the space itself approved by the state licensing agency. Make the lease contingent on that approval, not the other way around.
  2. Locate along the parent commute. Use Location Intelligence to find Dayton, OH neighborhoods with young families and workplaces nearby, plus safe, ample drop-off and pick-up circulation.
  3. Size by children, not square feet alone. Most states require 35–50 sq. ft. of indoor space per child plus an outdoor play area. A 20-child program needs roughly 1,000 sq. ft. of usable classroom space before support rooms.
  4. Check the child-specific building codes. Verify two exits per floor, sprinklers for infant rooms, fire alarms for 30+ children, child-size toilets and sinks, and clean history on asbestos and lead paint. Retrofits are expensive.
  5. Plan the layout for supervision. The space must divide into age-separated classrooms with clear sightlines for staff, a compliant kitchen, nap areas, and storage. An open floor plan that can't be partitioned is a dealbreaker.
  6. Commit long, but budget carefully. Daycare leases typically run 5–10 years, so model rent, build-out, and playground costs against enrollment revenue with the Lease Calculator before signing, with attorney review.
Read The Full Guide →
List
Map
Why this one?