Multifamily Development
249 S Avenue 54 Los Angeles, CA 90042
249 S Avenue 54, Los Angeles, CA, 90042
$2,450,000
For Sale
$2,450,000
Ready-to-issue permitting for an ADU-rich redevelopment with alley-access bungalows and future duplex and detached units.
Property Size24,210 SF
Lot Size0.41 Acres
Price / SF$101.20
Days on Market312
Property Features for 249 S Avenue 54
General Information
- Standard status
- Active
- Size
- 24,210 SF
- Lot size
- 0.41 Acres
- Property subtype
- Lots/Land
Listing Agency
Citivest Realty Services, Inc
(310) 905-4834
Listed by
Martin Fish · License #01988997
(310) 905-4834
Source
Exitrealty
Added: Sep 10, 2025 Checked: Jul 17 at 4:52 am
Displayed information is deemed reliable but is not guaranteed and should be independently verified. All listing content including descriptions, pricing, images are the copyrighted material of Citivest Realty Services, Inc
Investment Insights
Based on property information with market context.
This is a 12-unit ready-to-issue (RTI) redevelopment project with alley access. The existing property includes three separate bungalow homes, all delivered fully vacant, with no relocation required. Approved plans call for four new construction duplex structures and two detached ADUs.
The project is located at 249 S Avenue 54 in the Highland Park community of Los Angeles. The site has alley access and is described as minutes from Downtown Los Angeles, positioned between Griffith Observatory and the 110 Parkway.
Subject to obtaining a Certificate of Occupancy, the new owner can capture six additional ADUs by right, and recent code updates would allow up to 8 ADUs, for a total unit count of 16. The proposed development is approximately 24,210 square feet on a 17,882 square foot lot and is designed to include a full sprinkler system and full compliance with the latest seismic and building codes. Unit mix in the approved plan includes eight 5B/5B units and eight 2B/2B ADUs. The remarks also cite an estimated annual NOI of approximately $768,903. Listing is offered for sale as an RTI project with permits in place and a fully vacant delivery.
The project is located at 249 S Avenue 54 in the Highland Park community of Los Angeles. The site has alley access and is described as minutes from Downtown Los Angeles, positioned between Griffith Observatory and the 110 Parkway.
Subject to obtaining a Certificate of Occupancy, the new owner can capture six additional ADUs by right, and recent code updates would allow up to 8 ADUs, for a total unit count of 16. The proposed development is approximately 24,210 square feet on a 17,882 square foot lot and is designed to include a full sprinkler system and full compliance with the latest seismic and building codes. Unit mix in the approved plan includes eight 5B/5B units and eight 2B/2B ADUs. The remarks also cite an estimated annual NOI of approximately $768,903. Listing is offered for sale as an RTI project with permits in place and a fully vacant delivery.
Key Highlights
- 12‑unit RTI (Ready‑to‑Issue) ADU redevelopment with alley access at 249 S Avenue 54, Los Angeles
- Approved plans for four new construction duplex structures and two detached ADUs; CofO allows six additional ADUs by right
- Unit count increase path: approved project plus by‑right ADUs, with code updates allowing up to 8 ADUs total (16 units total)
Property Analytics
Property Profile
Location Intelligence
Current Use by Public Records
Apartment buildings
Similar For Sale Nearby
FAQs
What type of property is this?
Apartment building - Ready-to-issue permitting for an ADU-rich redevelopment with alley-access bungalows and future duplex and detached units.
Where is this apartment building located?
The property is located at 249 S Avenue 54 Los Angeles, CA.
What is the asking price?
The asking price for this property is $2,450,000.
What are key features of this property?
This property features: 12‑unit RTI (Ready‑to‑Issue) ADU redevelopment with alley access at 249 S Avenue 54, Los Angeles; Approved plans for four new construction duplex structures and two detached ADUs; CofO allows six additional ADUs by right; Unit count increase path: approved project plus by‑right ADUs, with code updates allowing up to 8 ADUs total (16 units total)