4920 Augusta Rd Garden City, GA 31408-1731
Current Zoning C-2, Commercial Proposed Land Use Service station for electric fleet vehicles GENERAL INFORMATION Project Description: The applicant is proposing to develop a state-of-the-art electric vehicle (EV) charging facility with 127 truck charging stalls and 127 vehicle parking stalls, 4,800 square-foot operations building, and 4,500 square-foot maint…
Cap rate
Implied · in-place · derived from last sale + estimated NOIValue
AI, CAP & Alternative Use estimations · Realmo proprietary blendProperty tax & assessments
Comparables
6 recent transactions · within 1.5 miComparable in this City
Similar Nearby for Sale
Similar Nearby for Lease
Property description
Physical attributes from public recordsZoning & alternative use
C-2 · Garden City, GACurrent Zoning C-2, Commercial Proposed Land Use Service station for electric fleet vehicles GENERAL INFORMATION Project Description: The applicant is proposing to develop a state-of-the-art electric vehicle (EV) charging facility with 127 truck charging stalls and 127 vehicle parking stalls, 4,800 square-foot operations building, and 4,500 square-foot maintenance building. Additional Background: A general development plan for this proposed development was presented to the Planning Commission on May 9, 2023. PC 3-24-1076 is a new application. The layout is the same as previously presented with the additional clarifying note added to the plans (see note 8, pages 3 and 4): 8. FACILITY SHALL BE PROHIBITED FROM THE FOLLOWING USES: 8.1. TRUCK ASSEMBLY 8.2. DISPATCHING 8.3. LOADING/UNLOADING OF TRUCKS 8.4. STORAGE OF GOODS 8.5. CONTAINER STORAGE FINDINGS Staff has determined this application is complete and contains all the required information. In conformance with the City of Garden City Zoning Ordinance Section 90-48, the following factors are to be considered for a General Development Plan review: Page 2 of 3 1. Proposed uses and overall development plan This facility is the first of its kind in the area and will provide charging facilities for electric vehicles and trucks. The project is proposed for development in two phases. The first phase will include both buildings, passenger vehicle parking, and 37 truck charging stations. The second phase will add an additional 90 truck charging stations. 2. Façade elevation plan indicating building orientation and scale; exterior construction materials, including texture and color; roof shape, window and door openings, porches, and balconies; architectural style or structure and the facade architectural treatment. The operations building will be located adjacent to US Highway 80 and features metal
Costs & Benchmarks
Operating expenses, capex projections, utility benchmarks, and submarket comparables — all in one view.
Risks
Flood, climate, environmental, title, and tenant-concentration risk — surfaced with mitigations and source citations.