120 Fairview St Fountain Inn, SC 29644-1806
-
Chirons Martial Arts Academy Gym & Fitness Center
-
Betsy Tanner Law Law Firm
Property zoned O-S, R-C, GR-1, GR-2, R-M, R-MHP, C-1, D-MU and N-C: Maximum of 6 feet above the center line of the closest adjacent street. Materials Brick, stone, wood, metal or composite material. Materials utilized in the sign structure shall be complimentary to those utilized for structures in the same development. Lighting External or internal Landscapi…
Cap rate
Implied · in-place · derived from last sale + estimated NOIValue
AI, CAP & Alternative Use estimations · Realmo proprietary blendProperty tax & assessments
Tax year 2023Comparables
6 recent transactions · within 1.5 miComparable in this City
Similar Nearby for Sale
Similar Nearby for Lease
Property description
Physical attributes from public recordsZoning & alternative use
C-1 · Fountain Inn, SCProperty zoned O-S, R-C, GR-1, GR-2, R-M, R-MHP, C-1, D-MU and N-C: Maximum of 6 feet above the center line of the closest adjacent street. Materials Brick, stone, wood, metal or composite material. Materials utilized in the sign structure shall be complimentary to those utilized for structures in the same development. Lighting External or internal Landscaping Must be located in a landscaped area that does not impede vehicular or pedestrian circulation. At a minimum, the landscaped area shall include ground cover and low - growing plants such as ornamental grasses, shrubs, or perennials, and may also FOUNTAIN INN UDO| ARTICLE 9 9-22 include mulch or decorative stone to ensure year-round visual interest and integration with the surrounding site design. Additional Standards for Sign Structure The maximum size of the sign and sign structure shall not exceed 120 square feet in area or 7 feet in height above the center line of the closest adjacent street. For single-tenant property: maximum sign size is 40% of sign structure For multi-tenant property: maximum sign size is 60% of sign structure Electronic Displays Electronic displays, including changeable copy messages, may be permitted in the
Costs & Benchmarks
Operating expenses, capex projections, utility benchmarks, and submarket comparables — all in one view.
Risks
Flood, climate, environmental, title, and tenant-concentration risk — surfaced with mitigations and source citations.