12121 Grant St, Thornton, CO 80241
Large data center with built-in power and cooling capacity plus generator-backed redundancy for technology tenants.
Property Features for 12121 Grant St
General Information
Additional Details
Building Details
Displayed information is deemed reliable but is not guaranteed and should be independently verified. All listing content including descriptions, pricing, images are the copyrighted material of Marcus & Millichap - Denver
Investment Insights
Based on property information with market context.
The cooling plant totals 3,000 tons, including 2,000 tons of chilled water capacity and 1,000 tons of free cooling. Connectivity is supported by existing carrier presence, including Comcast, Verizon, CenturyLink, AT&T, and Dish, with dark fiber routes to the 1500 Champa carrier hotel for private network connectivity.
Designed for technology-heavy operations, the property’s existing infrastructure and available data center space can support colocation, cloud, edge compute, enterprise data center, and AI inference applications. The description also notes zoning that supports expanded operations, providing flexibility for an operator seeking to grow within the facility’s current systems.
Key Highlights
- 267,177 SF data center and office facility in the Denver Metro with existing income
- Currently using 3.5 MW of utility power; switchgear and distribution, backup power, and cooling sized for 7 MW
- Generator‑backed redundancy includes five 1,200 kW diesel generators for 6.0 MW backup capacity plus 30,000 gallons of on‑site diesel storage
Property Analytics
Current Use
Lease Details
Location Intelligence
Trade Area within ½ mile
Demographics for 80241, CO
Market
Vacancy Rate% for Office in West region