300-320 Owings Industrial Park Gray Court, SC 29645
- Industrial properties
- 235,000 SF
Current Use by Public Records
- Industrial properties
Property Details for 300-320 Owings Industrial Park
- Property size
- 235,000 SF
- Property type
- Industrial properties
- Property subtype
- Manufacturing properties
Description
The Mill, located at 300-320 Owings Industrial Park in Gray Court, South Carolina, offers a prime industrial development opportunity within the Greenville, SC MSA. This two-phase project encompasses approximately 235,000 square feet of modern industrial space situated on a 33-acre lot. Phase 1 provides 99,900 square feet, divisible into three 33,300-square-foot bays, while Phase 2 offers 136,080 square feet, divisible into three 45,360-square-foot bays. The property boasts impressive specifications, including 32-foot clear heights, ESFR fire protection, energy-efficient LED lighting, and ample truck courts. The site includes 25 loading docks and 8 drive-ins, along with 262 total parking spaces. Power is supplied by a robust 3000-amp, 3-phase system. The property is zoned for industrial and manufacturing use and benefits from significant tax incentives. Strategically located in Laurens County's Owings Industrial Park, near major companies like ZF Transmission and Sunny Days, The Mill enjoys excellent access to key markets: 20 miles to Greenville, 28 miles to Inland Greer Port, and a central position between Charlotte, Columbia, and Atlanta. The project is scheduled for completion in 2026 and is currently accepting pre-leasing inquiries. Minimum divisible space is 99,900 square feet, with a maximum contiguous space of 136,080 square feet. The entire building totals 235,000 square feet.
Value Estimation
-
CAP approach
-
Comparable approach
-
Alternative Use
Location Insight
- Map
- Local Demand
- City
- Gray Court
- County
- Laurens
- State
- South Carolina
- Longitude
- -82.1453
- Latitude
- 34.6391