36 Bacon Sq Plainville, MA 02762-2067
, and the SPGA shall issue a special permit for any earth removal within the TCD which exceeds 350 square yards. H. Special permit. The Planning Board shall approve, approve with conditions, or deny an application for a special permit submitted on a form specified by the SPGA after considering whether the project meets the criterion below: (1) Minimize the v…
Cap rate
Implied · in-place · derived from last sale + estimated NOIValue
AI, CAP & Alternative Use estimations · Realmo proprietary blendProperty tax & assessments
Tax year 2024Comparables
6 recent transactions · within 1.5 miComparable in this City
Similar Nearby for Sale
Similar Nearby for Lease
Property description
Physical attributes from public recordsZoning & alternative use
TCD · Plainville, MA, and the SPGA shall issue a special permit for any earth removal within the TCD which exceeds 350 square yards. H. Special permit. The Planning Board shall approve, approve with conditions, or deny an application for a special permit submitted on a form specified by the SPGA after considering whether the project meets the criterion below: (1) Minimize the volume of cut and fill, the number of removed trees six inches caliper or larger, the length of removed stone walls, the area of wetland vegetation displaced, the extent of stormwater flow increase from the site, soil erosion, and threat of air and water pollution; (2) Maximize pedestrian and vehicular safety both on the site and egressing from it; (3) Minimize obstruction of scenic views from publicly accessible locations; (4) Minimize visual intrusion by controlling the visibility of parking, storage, HVAC or other outdoor service areas viewed from public ways or premises residentially used or zoned; (5) Minimize glare from headlights and lighting intrusion and light overspill into the night sky; (6) Provide adequate access to each structure for fire and other emergency service equipment; (7) Provide adequate stormwater management consistent with the functional design standards in the Planning Board's Subdivision Rules and Regulations; [3] [3]
Costs & Benchmarks
Operating expenses, capex projections, utility benchmarks, and submarket comparables — all in one view.
Risks
Flood, climate, environmental, title, and tenant-concentration risk — surfaced with mitigations and source citations.