334 Hawthorne Ave Point Pleasant Beach, NJ 08742-2539
For all commercial, office, building and fuel supply uses in the HC zone which abut a residential zoning district, a five foot buffer strip shall be maintained between the use and the adjacent zoning district. The buffer strip shall consist of landscaped grounds and suitable screening to safeguard the character of the adjacent districts. The buffer area shal…
Cap rate
Implied · in-place · derived from last sale + estimated NOIValue
AI, CAP & Alternative Use estimations · Realmo proprietary blendProperty tax & assessments
Tax year 2023Comparables
6 recent transactions · within 1.5 miComparable in this City
Similar Nearby for Sale
Similar Nearby for Lease
Property description
Physical attributes from public recordsZoning & alternative use
HC · Point Pleasant Beach, NJFor all commercial, office, building and fuel supply uses in the HC zone which abut a residential zoning district, a five foot buffer strip shall be maintained between the use and the adjacent zoning district. The buffer strip shall consist of landscaped grounds and suitable screening to safeguard the character of the adjacent districts. The buffer area shall contain a screen planting at least six feet in height when planted. Plant material which does not live shall be replaced. Native vegetation will be planted within the buffer strip as deemed appropriate by the board engineer based upon specific site conditions. e. Minimum Off-Street Loading. 1. Each activity shall provide for off-street loading and unloading with adequate ingress and egress from streets and shall provide such area(s) at the side or rear of the building. 2. There shall be at least one trash and/or garbage pick-up location provided by each building which shall be separated from the parking spaces by either a location within the building or in a pick-up location outside the building which shall be a steel-like, totally enclosed container located in a manner to be obscured from view from parking areas, streets and adjacent residential uses or zoning districts by a fence, wall, planting or combination of the three. If located within the building, the doorway may serve both the loading and trash/ garbage functions and if located outside the building, it may be located adjacent to or within the general loading area(s) provided the container in no way interferes with or restricts loading and unloading functions.
Costs & Benchmarks
Operating expenses, capex projections, utility benchmarks, and submarket comparables — all in one view.
Risks
Flood, climate, environmental, title, and tenant-concentration risk — surfaced with mitigations and source citations.