226 Main St Oakboro, NC 28129-7718
Sec. 435 - Manufacturing and Industrial District (I) (a) District Intent The Manufacturing and Industrial (I) district is established to accommodate heavy manufacturing uses, including storage and processing of raw materials, fabrication and processing from raw materials, resource extraction, assembly, distribution, storage, and wholesales sale of finished o…
Cap rate
Implied · in-place · derived from last sale + estimated NOIValue
AI, CAP & Alternative Use estimations · Realmo proprietary blendProperty tax & assessments
Tax year 2024Comparables
6 recent transactions · within 1.5 miComparable in this City
Similar Nearby for Sale
Similar Nearby for Lease
Property description
Physical attributes from public recordsZoning & alternative use
I · Oakboro, NCSec. 435 - Manufacturing and Industrial District (I) (a) District Intent The Manufacturing and Industrial (I) district is established to accommodate heavy manufacturing uses, including storage and processing of raw materials, fabrication and processing from raw materials, resource extraction, assembly, distribution, storage, and wholesales sale of finished or semi-finished products from previously prepared materials. The district also allows commercial activities intended to serve the primary businesses in the district and their employees. Uses allowed in the district may require large amounts of land or large building areas for operation or large yard areas for isolation or protection from adjoining premises or activities. Activities take place outdoors or indoors. Buildings or uses are situated in outlying areas on large tracts to reduces impacts on adjacent lower intensity uses. Heavy industrial uses and uses with significant adverse impacts on adjoining lands, single- family detached homes, and other low-intensity uses are permitted (b) Typical Development Figure 3129 Figure 3230 (c) Dimensional Standards [1] Requirements Commercial and Industrial Uses All Other Uses Max. Density (units/ac) N/A N/A Min. Lot Area (sf) 174,420 43,560 Min. Lot Width (lf) 200 150 Minimum Street Setback (lf) From Arterial/Collector 60 50 From Local 60 40 Min. Access Easement Setback (lf) N/A 15 Min. Side or Rear Lot Line Setback from a
Costs & Benchmarks
Operating expenses, capex projections, utility benchmarks, and submarket comparables — all in one view.
Risks
Flood, climate, environmental, title, and tenant-concentration risk — surfaced with mitigations and source citations.