16 Old Frg Rd Rocky Hill, CT 06067-3729
-
Whitestone Associates, Inc. Engineering Consultant
-
Tornik, LLC Factory Production Facility
Zoning Permit in the TC -Town Center, RC -Regional Commercial, C -Commercial, OP -Office Park, BP2 - Business Park 2 and WBP-Waterfront Business Park; subsection 2. Zoning permit in TC -Town Center and subsection 3. Zoning Permit in RC-Regional Commercial; Effective 09-27-2023: Add to Section 2. B Defined Terms: 1. ELECTRIC VEHICLE CHARGING STATION - an elec…
Cap rate
Implied · in-place · derived from last sale + estimated NOIValue
AI, CAP & Alternative Use estimations · Realmo proprietary blendProperty tax & assessments
Tax year 2023Comparables
6 recent transactions · within 1.5 miComparable in this City
Similar Nearby for Sale
Similar Nearby for Lease
Property description
Physical attributes from public recordsZoning & alternative use
OP · Rocky Hill, CTZoning Permit in the TC -Town Center, RC -Regional Commercial, C -Commercial, OP -Office Park, BP2 - Business Park 2 and WBP-Waterfront Business Park; subsection 2. Zoning permit in TC -Town Center and subsection 3. Zoning Permit in RC-Regional Commercial; Effective 09-27-2023: Add to Section 2. B Defined Terms: 1. ELECTRIC VEHICLE CHARGING STATION - an electric component assembly or cluster of component assemblies designed specifically to charge batteries within electric vehicles by permitting the transfer of electric energy to a battery or other storage device in an electric vehicle; RELATED DEFINITIONS: DIRECT CURRENT FAST CHARGING STATION - an electric vehicle charging station that utilizes direct current electricity (40Kw or greater); LEVEL TWO ELECTRIC VEHICLE CHARGING STATION - an electric vehicle charging station that supplies 208 to 240-volt alternating current; PUBLIC ELECTRIC VEHICLE CHARGING STATION - an electric vehicle charging station located at a publicly available parking space; Modify Section 7.B.2.1 Number of Parking Spaces, to add: The Commission shall require with each new construction of a commercial building or multiunit residential building with thirty (30) or more parking spaces for cars or light duty trucks to include the electric vehicle charging infrastructure capable of supporting level two electric vehicle charging stations or direct current fast charging stations in at least a minimum of 10% of the required parking spaces. Effective 11-22-2023: Modify the language of Section 9.C.6 3. Minor Changes and Section 9.C.6.4 Maj or Changes. Effective 0 4-01-2024: Add to Section 6.0.2 Dispensary -Medical Marijuana "and Adult -Use Cannabis: Retailer"; Add to Section 2. B Defined Terms: a.) CANNABIS - Marijuana as defined in Section 2 l a-240 Connecticut General Statutes; b.) DIS PENSARY-. Means a place of business where cannabis may be dispensed, sold, or distributed in accordance with Chapter 420f, C.G.S. and any regulations adopted thereunder, to qualifying patients and caregivers, and to which the department has issued a dispensary facility license under Chapter 420f, C.G.S. ; c.) ADULT USE CANNABIS RETAILER - A person, excluding a dispensary facility , that is licensed to purchase cannabis and cannabis products from producers, cultivators, product manufacturers, and food and beverage manufacturers and to sell cannabis and cannabis products to consumers and research programs; Modify the language of Section 3.C. Accessory Uses; 3.C.1. Permitted By Right (No Zoning Permit Required) Add subsection 7.
Costs & Benchmarks
Operating expenses, capex projections, utility benchmarks, and submarket comparables — all in one view.
Risks
Flood, climate, environmental, title, and tenant-concentration risk — surfaced with mitigations and source citations.