9300 Cherry Avenue, Fontana, CA 92335
Planned phases include build-to-suit opportunities and large-scale industrial development.
Property Features for 9300 Cherry Avenue
General Information
Spaces For Lease
at 9300 Cherry Avenue Contact usBuilding 2 Available
Building 3 - BTS Available
Building 3B - BTS Available
Building 4 - BTS Available
Building 4B - BTS Available
Building 5 - BTS Available
Building 6 - BTS Available
Building 7 - BTS Available
Displayed information is deemed reliable but is not guaranteed and should be independently verified. All listing content including descriptions, pricing, images are the copyrighted material of CBRE
Investment Insights
Based on property information with market context.
Phase I comprises two buildings totaling approximately 1.8 MSF, with groundbreaking planned for Summer 2023. Phase 2 includes build-to-suit opportunities ranging from 900,000 SF to over 3.0 MSF, with groundbreaking planned for 2Q 2024. Phase 3 is planned to add an additional 1.5 MSF. The property is positioned within the Inland Empire West and is identified by the Speedway Commerce Center name.
Key Highlights
- 6,600,000 SF industrial land offering
- Phase I includes two buildings totaling approximately 1.8 MSF
- Phase 2 build‑to‑suit opportunities range from 900,000 SF to over 3.0 MSF