79 Sheikh Zayed Road, , FL, FL
- Added:
- Jun 6, 2026
- Days on Market:
- 27
- Last Refresh:
- Jul 2 at 2:06 am
Property Features
General Information
- Property type
- Residential
- Property subtype
- Office
- Property condition
- Under Construction
- Parking
- 8
- Parking features
- Assigned, Covered, Garage
- Security features
- Security System
- Standard status
- Active
Taxes and HOA fees
- Tax Description
- AHS Tower
Utilities
- Sewer type
- Public Sewer
- Heating system
- Central, Electric (Heating)
- Cooling system
- Central Air
- Water source
- Public
Building Details
- Year built
- 2026
- Building materials
- Block
Listing agent Aleksandra Marzec License #3035514 (305) 760-9121
Listing office The World Realty, Inc 1221 Brickell Ave Ste 900, Miami, FL (305) 928-3516
Listing date Jun 6, 2026
Copyright © 2026 Miami REALTORS®. All rights reserved. All information provided by the listing agent/broker is deemed reliable but is not guaranteed and should be independently verified.
HighLights
- Under construction; Year built 2026; 69‑story skyscraper project
- Shell & core options: full floors 6,695 sq. ft. and half floors from 2,964 sq. ft.
- Luxury amenities on Levels 62 & 63 include private fitness club, indoor heated pool, wellness spa, winter garden, and executive cigar lounge
- Advanced infrastructure includes 17 high‑speed elevators, 500+ parking spaces, and 24/7 concierge via the Lujo App
- Connectivity includes direct bridge access to Emirates Towers Metro Station
- Completion scheduled for Q4 2026
Overview
The tower is located on Sheikh Zayed Road in Dubai, described as being in the financial heart near key landmarks including the Museum of the Future and Burj Khalifa. Connectivity is highlighted with direct bridge access to the Emirates Towers Metro Station, and the development is noted as being minutes from Downtown Dubai and World Trade Centre.
For office and healthcare-adjacent operators seeking a high-rise corporate address, the configuration supports flexible build-out as a tenant’s space, with options for either full-floor occupancy or smaller half-floor footprints. On-site amenity space referenced for levels 62 and 63 includes a private fitness club, indoor heated pool, wellness spa, winter garden, and an executive cigar lounge. Completion is scheduled for Q4 2026.