1004-C Industrial Court Weatherford, TX 76087
COMMERCIAL - Weatherford, TX
Property Features for 1004-C Industrial Court
General Information
- Property type
- Commercial Lease
- Property subtype
- Other
- Property condition
- Under Construction
- Parking features
- Oversize
- Standard status
- Active
- APN
- R000132007
- Lot size
- 2.00 Acres
Taxes and HOA fees
- Tax Description
- Acres: 2.000, Lot: 11, Subd: RIC WILLIAMSON INDUS
Utilities
- Sewer type
- Septic Tank
Building Details
- Year built
- 2026
- Floors in Building
- 1
- Number of units
- 1
- Flooring type
- Concrete
- Building materials
- MetalSiding
- Roof type
- Metal
Listing agent Matt Milligan License #0500456 (817) 594-8183
Listing office Trinity Country Real Estate Weatherford, TX (817) 594-8183
Listing date Jun 17, 2026
Copyright © 2026 North Texas Real Estate Information Systems, Inc. All rights reserved. All information provided by the listing agent/broker is deemed reliable but is not guaranteed and should be independently verified.
Investment Insights
Based on property information with market context.
The property sits just off Ric Williamson Memorial Loop between Highway 51 and FM 730, with convenient access to major regional routes including I-20. Construction is underway, and completion is expected in approximately 60 days, with a stated completion date of September 2026. The building is located on a 2-acre lot in Parker County, which is described as a high-growth area within the Dallas-Fort Worth metroplex.
This space is a practical fit for businesses that need a new industrial shell with loading capacity and moderate office support. With roll-up access, high clear height, and on-site parking, it can support a range of warehousing and light distribution users. Prospective tenants should review build-out timing and operating cost responsibilities, since utilities and trash are tenant-paid.
Key Highlights
- New 2,500 SF industrial building under construction in Weatherford, TX (Year built 2026) with completion expected in about 60 days; completion date September 2026.
- 50' x 50' metal building with 16‑foot ceilings and concrete flooring.
- Two 12' x 14' roll‑up doors for loading and unloading.