940 McKinley Parkway, Delano, MN 55328
- Added:
- Mar 24, 2026
- Days on Market:
- 81
- Last Refresh:
- Jun 12 at 5:06 pm
Property Features for 940 McKinley Parkway
General Information
- Property type
- Commercial Sale
- Property subtype
- Other
- Zoning
- Business/Commercial,Industrial
- Parking features
- Driveway, Garage, Garage - Attached, Guest, Heated, Parking Lot, Paved or Surfaced, Tandem
- Exterior features
- Brick/Stone, Metal, Other
- Standard status
- Active
- APN
- TBD
- Size
- 1,568 SF
- Lot size
- 0.03 Acres
Taxes and HOA fees
- Tax Year
- 2026
- Tax Annual Amount
- 0
Utilities
- Heating system
- Radiant
- Cooling system
- Ductless
Building Details
- Year built
- 2026
- Flooring type
- Concrete, Drainage
- Building materials
- Block, Frame
- Roof type
- Asphalt, Shingle
- Architectural style
- Other
Listing agent Martin Turner (612) 695-0167
Listing office eXp Realty 4525 White Bear Parkway, White Bear Lake, MN (320) 500-4397
Listing date Mar 24, 2026
Copyright © 2026 Northstar MLS. All rights reserved. All information provided by the listing agent/broker is deemed reliable but is not guaranteed and should be independently verified.
HighLights
- Highly customizable unit suitable for office, warehouse, workshop, showroom, or garage.
- Potential to add a mezzanine level for a total of 1,568+ SF.
- High‑quality construction with 5" concrete floors, floor drains, and 20’ high ceilings.
- Equipped with 3‑phase power, water & sewer, and roughed‑in bathroom.
- Includes fire suppression and in‑floor radiant heating; option to add split system for cooling.
- Commercial grade windows, entry door, and 14' x 14' garage door.
Overview
Additional configuration options are available, including the ability to add a mezzanine level for more indoor space. The listing also notes upgrades can be selected to tailor the unit, with options such as adding a bathroom, wet bar, kitchenette, or other amenities.
With its combination of overhead height, floor drainage, and vehicle-access garage door, the unit is well suited for users who need both workspace and showroom or light industrial functions, including small operators who want the ability to finish the interior to match their workflow. Phase 3 is scheduled for completion in late June 2026.
Current Use by Public Records
Location Insight
- Map
- Local Demand
- City
- Delano
- County
- Wright
- State
- Minnesota
- Longitude
- -93.81172456
- Latitude
- 45.05153168